frogcase2002 Posted September 30, 2016 Author Report Share Posted September 30, 2016 Got alot of experience and do kerfs and everything but iv just done it as side work and usually just made like 50-60 profit on enclosures50-60 profit on enclosures is dirt. Lol yea I know . I just really like doing it but need to make more having a shop. Thats why im trying to figure out how much we should charge . . Seen some places making between 3 and 400 for dual 15 enclosures and shit . . I just want to make decent money and still give people decent deals . Clarion cz702 Ssa evil mids and tweeters ppi 900.4 2 zcon 18s Taramps 10k 3 big dekas 1 xs 3 runs of 4/0 and big 3 300+ amp ohio generator 155.7 on dash at 36 (peak) 152 at 25 Link to comment Share on other sites More sharing options...
frogcase2002 Posted September 30, 2016 Author Report Share Posted September 30, 2016 Just got done with an enclosure for 6 sundown e10s with flush mount subs and kerfed port and used birch. . Im getting 250 for that one . . Think thats decent? Was around 140 in materials Clarion cz702 Ssa evil mids and tweeters ppi 900.4 2 zcon 18s Taramps 10k 3 big dekas 1 xs 3 runs of 4/0 and big 3 300+ amp ohio generator 155.7 on dash at 36 (peak) 152 at 25 Link to comment Share on other sites More sharing options...
ChevyBoy95 Posted September 30, 2016 Report Share Posted September 30, 2016 Just got done with an enclosure for 6 sundown e10s with flush mount subs and kerfed port and used birch. . Im getting 250 for that one . . Think thats decent? Was around 140 in materials To cheap IMO. How long did it take from first cut to completion? carpet? paint? When you add kerfs price should go up, birch, price should go up, flush mount, price goes up. Best Score to Date : 160.5 dB Outlaw (47Hz)[4 XM 15's & 2 Taramps Bass 12k's] BL : http://www.stevemeadedesigns.com/board/topic/147800-chevyboy95s-4-15s-7krms-wall-1533-db-on-half-power/YouTube: http://www.youtube.com/hitemwiththeflex/ Link to comment Share on other sites More sharing options...
frogcase2002 Posted September 30, 2016 Author Report Share Posted September 30, 2016 Just got done with an enclosure for 6 sundown e10s with flush mount subs and kerfed port and used birch. . Im getting 250 for that one . . Think thats decent? Was around 140 in materialsTo cheap IMO. How long did it take from first cut to completion? carpet? paint? When you add kerfs price should go up, birch, price should go up, flush mount, price goes up. Carpeted . Painted port and painted around were the flush pieces are. . . Probably took like 4 or 5 hours or so but not 100 percent sure cause it was over 2 days cause was working on other shit at the same time Clarion cz702 Ssa evil mids and tweeters ppi 900.4 2 zcon 18s Taramps 10k 3 big dekas 1 xs 3 runs of 4/0 and big 3 300+ amp ohio generator 155.7 on dash at 36 (peak) 152 at 25 Link to comment Share on other sites More sharing options...
ChevyBoy95 Posted September 30, 2016 Report Share Posted September 30, 2016 Just got done with an enclosure for 6 sundown e10s with flush mount subs and kerfed port and used birch. . Im getting 250 for that one . . Think thats decent? Was around 140 in materialsTo cheap IMO. How long did it take from first cut to completion? carpet? paint? When you add kerfs price should go up, birch, price should go up, flush mount, price goes up. Carpeted . Painted port and painted around were the flush pieces are. . . Probably took like 4 or 5 hours or so but not 100 percent sure cause it was over 2 days cause was working on other shit at the same time Yea, I probably would have charged more, but the stuff I do is out of a garage for side work. But then again if you can make enough to support the shop and sell equipment for some profit with the box, who knows. I don't want to toss real figures since I personally havent done anything store front. Best Score to Date : 160.5 dB Outlaw (47Hz)[4 XM 15's & 2 Taramps Bass 12k's] BL : http://www.stevemeadedesigns.com/board/topic/147800-chevyboy95s-4-15s-7krms-wall-1533-db-on-half-power/YouTube: http://www.youtube.com/hitemwiththeflex/ Link to comment Share on other sites More sharing options...
Team Bassick - Kimo Posted September 30, 2016 Report Share Posted September 30, 2016 Figure out a day rate. Hourly will bleed you slowly. Out of my home I am at $500 a day. Most boxes are 1/2 day builds but, material, travel time and so on. Just my .02 KIMO @teambassick http://www.teambassick.com Link to comment Share on other sites More sharing options...
dsw422 Posted October 2, 2016 Report Share Posted October 2, 2016 I'm with Triticum and Wasteland.. I use about the same methods as both of them. I don't make alot like you but I've only been doing this on the side for a little over a year so Im not trying to make a killing... I sometimes make $100 on a build and some a little more.. I did a giveaway box a while back that was loaded with a Sundown e10. But that helped get my name out there more and sent some more builds my way.. 2014 Ford Focus SE Sedan Factory Sony 10 Speaker Sound System 1994 Ford Bronco Dual head unit (i kno) Sony door speakers Kenwood Rear Speakers Custom Center console in the works. will house an NVX NSW10" https://m.facebook.com/WinnsCustomCarAudio/ Link to comment Share on other sites More sharing options...
Skullz Posted October 2, 2016 Report Share Posted October 2, 2016 The very bare minimum would be double the cost of materials. As the other have pointed out that time, materials used and complexity will add costs you have to factor in your estimate. 01 Ford focus ZX3 Pioneer AVH-X491BHS PPI PC 4800.2 Morel Maximo 6.5" x2 Link to comment Share on other sites More sharing options...
ckeeler11 Posted October 3, 2016 Report Share Posted October 3, 2016 If materials were $140 now you have to account for utilities used, wear and tear on tools, By the end you are probably paying yourself between $10-$15 an hour. seems pretty cheap to me. I would have charged $350.00 sounds like a badass box. Link to comment Share on other sites More sharing options...
xpoppadaddyx Posted October 3, 2016 Report Share Posted October 3, 2016 Just build you three enclosures for display entry level - advanced. This will be your baseline cost. You know this because you've calculated time, material, and shop fee. Then you can add all that other costs associated such as carpet, paint, fiberglass, nails/screws etc. 2002 Chevy Trailblazer (Build) 2013 Nissan Altima (Build) Poppa's YouTube Channel Poppa's FB Page Poppa's Instagram Link to comment Share on other sites More sharing options...