Jump to content

Hugh G. Rection

Members
  • Posts

    4209
  • Joined

  • Last visited

  • Days Won

    6

Posts posted by Hugh G. Rection

  1. i am hosting an spl show on august 24th at the georgia national fairgrounds in perry georgia as a part of the "summer showdown" car and truck show.

    entry will be $20, re-runs are $5, and the gates open at 8 am, and the competition begins at 11am and goes until 2:30 pm.

    the show will be judged using termlab usb, with awards for first and second.

    there will be lots of media and magazine coverage at this show, as well as lots of nice cars and trucks

    termlab testing will also be available from 9am to 11am, at a fee of $1 per run for entered competitors, 2$ per run for non-entered competitors.

    4 main classes based on total inches of subwoofer:

    0-15" 16-24" 25-36" 37"+

    $5 entry into one of the 2 bonus classes if entered into one of the 4 main classes. bonus classes are:

    Freestyle (outlaw), Port Wars

    contact ben at 912-541-4081

    http://www.myspace.com/maxxproductions

    l_d31cb2c12a694528b98c448a3446003c.jpg

  2. its at legends, at 1pm. classes are 0-15", 16-24", 25-36", and 37 and up. just a little local show. its to benefit the boys and girls club. we will also be doing $5 port wars, as well as testing time on the meter. its gonna be on my termlab.

    for more info on the show contact me at 912-541-4081 (ben)

  3. well, the time has come for me to get in the bass race game. this is will most likely be the slowest build ever done, but should be great when finished.

    i should be picking up my van this weekend, its already mine just gotta go get it, lol.

    already got some stuff. the van is a dodge caravan, and it is now white. im gonna just do black primer, with kicker logo's painted on with gray primer, simple ftw! the things i already have is:

    -- 18" adr phantom wheels (with tires)

    -- whelen edge 9000 52" light bar (off of a de-commissioned ambulance)

    also, the van has sunroof, so i'll be locking that closed, and welding 3" steel pipe in to support the roof and the top of the windshield.

×
×
  • Create New...