dragonsage2008 Posted January 28, 2013 Author Report Share Posted January 28, 2013 going to order another DX15 tomorrow should have a rebuild in the next few weeks and might have my rear door speakers fiber glassed in.. top back Link to comment Share on other sites More sharing options...
dragonsage2008 Posted February 8, 2013 Author Report Share Posted February 8, 2013 got my 3rd 15" in lil different from the first 2. cone looks different and its about an 1" taller but AB said its safe to run them together specs sheets are the same... hopeing to get pics up this week... or next need to rebuild my port... its now 20 cu in to small... subs are wired down to 1.7 ohms... from there will work on geting my big 3 re done and get a xs power d3400 under the hood get my rear doors fiber glassed... and get the 4th sub and start the wall.. then get the old 2 subs replaced with the same as the new ones top back Link to comment Share on other sites More sharing options...
dragonsage2008 Posted May 30, 2013 Author Report Share Posted May 30, 2013 HMMM new build maybe????? http://s1268.photobucket.com/user/dragonsage2008/media/SAM_0301_zps96c2f0dd.jpg.html?sort=3&o=4 top back Link to comment Share on other sites More sharing options...
dragonsage2008 Posted May 30, 2013 Author Report Share Posted May 30, 2013 lets re try that http://s1268.photobucket.com/user/dragonsage2008/media/SAM_0301_zps96c2f0dd.jpg.html?sort=3&o=4 top back Link to comment Share on other sites More sharing options...
dragonsage2008 Posted May 30, 2013 Author Report Share Posted May 30, 2013 ok i forgot how to get it to show the pic not the link sorry for that top back Link to comment Share on other sites More sharing options...
dragonsage2008 Posted May 30, 2013 Author Report Share Posted May 30, 2013 the tare down starts.... top back Link to comment Share on other sites More sharing options...
dragonsage2008 Posted May 30, 2013 Author Report Share Posted May 30, 2013 time to clean her out and up and get it started.... top back Link to comment Share on other sites More sharing options...
dragonsage2008 Posted May 30, 2013 Author Report Share Posted May 30, 2013 AND ITS IN!!!!!!!!!!!! top back Link to comment Share on other sites More sharing options...
dragonsage2008 Posted May 30, 2013 Author Report Share Posted May 30, 2013 wall is almost finished need to sand and paint it yet... each sub is seeing 2.05 sealed and 2.16 ish... temp loading wall is on still need to seal it off from the back.... going to drop the top sub soon see how that works with more cubs in the ported side.... also thinking of trying to drop the sealed chambers down to 1.52 ish per sub sealed for the 3 of them and bringing the ported side to 2.63 ish per sub ported..... top back Link to comment Share on other sites More sharing options...
dragonsage2008 Posted May 30, 2013 Author Report Share Posted May 30, 2013 R.I.P David aka Enigma311311... top back Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.