Pioneer~Saturn Posted November 21, 2012 Report Share Posted November 21, 2012 Here are a few videos I took a bit before I started on the roof...with the roof stiffened up it's going to be more violent for sure. WIll have more posted when I can but with winter here idk when that'd be... Team Tupperware <First dual-alternator 'real' Saturn (pre-2002) on the planet>(3) 15" Fi SP4's fed by (2) M3a's strapped @ .66712.75 cubes net @ 25Hz with 200 sq inches of port area (lowz...?)Stock alt position (custom bracket) 225 amp Mechman Roof = steel and fiberglass (u mad?)(2) XS Power D3100's, (2) rhino batts, No battery upfront (for now, smh)4 power+ 4 ground runs of 1/0-gauge to rear"If its been done before...you're doing it wrong" : ) "stfu about scores and float $hit..." Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.