8 gallon tank, 2 viair 480c compressors, slam specialties RE-6 up front, re-7 bags out back, all SMC 1/2" valves, i have 5/8" line, dont know why i got so big, but ill prally go down to 1/2" line for dumps, i might keep the 5/8 for lift becuase when the system is in, theres gonna be ALOT of weight, so that will help slow it down alot too when lifting up.
i am doing bags on bars btw
wheel wells are already gone too. i cant wait to get the new chassis..gonna be powdercoated black (might have to just paint it, depending on the price) but either way its going black, and the 4 link will be setup correctly, welds will be ALOT better, etc..