CJ18 Posted October 13, 2011 Report Share Posted October 13, 2011 Finally got around to making a UBL for my truck. Hope everyone enjoys. Equipment list: Subs- 6 DC Level 3 15s and 1 Level 3 10 Amps- 1 DC 7.5k, 1 DC 1.2k, 2 DC 175.4 Batteries- 1 XS d6500, 1 D3400, 1 D680, 5 XS d1400 Alternator- 1 Iraggi 260a and 1 Mike Singer 350a Front Stage- 5 Sets AA Carbon Mids and 3 Sets Kicker SS tweeters. Please Leave comments here: http://www.stevemeadedesigns.com/board/topic/118463-cjs-06-f150-6-15s-and-20kw-1012-new-tl-and-pics-pg-19/ Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 5 XS D1400s XS Power 14v Intellicharger Got lucky and the buss bars I built for my old 3400s will fit these perfectly. 50' each of 4ga and 100' each of 8ga Knu Konceptz wire 2 pieces of 18"x24"x1" Plexi DC Level 3 10 DC 1.2k Mike Singer 350a alt- This Bitch is HUGE!!! Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Build has officially started. First on my list to do was to swap the dual alternator out for a new Mike Singer 350a unit. Singer on the Left, Mechman 270 on the right Installed Mechman Adjustable voltage 2 runs of 2/0 Welding wire running to the back 14v batteries Front D6500 running on the stock location iraggi 260. Stinger sent me a nice message with my volt meter If anyone knows how to make it tell me what the voltage is please do. Once it gets over 16.5 is just says HI. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Wall is starting to go up. Old false floor and amp rack Start of the new floor Stripped the old dynamat Second layer of back wall getting primed and painted Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Goal for today was to get the Second layer of the back wall installed, build the floor and get one side built and installed. Passenger side Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Plexi Window In the truck Thats is for tonight. Tomorrow I will get the drivers side and top built and installed. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 More done today. Passenger side brackets installed and side mounted in truck. Assembly of the driver side. Outer piece is wrapped and inner piece is painted blue 2 1/2" sandwich pieces to go around the plexi. Both sides now installed Top installed Bottom 45 started That is all I have for now. The bottom 45 is drying and will be installed today. I may try and get the top side corners installed today as well. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 The shell is 99% done. I have 6 corners that do require so small glassing, 4 on the bottom 45 where I had to notch around the bolts and brackets and 2 on the top side corners. I will get that work done tomorrow and get the front baffle planned out. Kind of burnt out after 4 days of work on this thing so tomorrow will be a nice easy day. I should have the front baffles cut and installed on Sunday and have everything ready for the arrival of the subs and amps on Wednesday. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Todays project is glassing the corners and getting it all sealed up ready for the front baffle and bracing tomorrow. Once the glass has dried, I will be adding some more on the outside in the top corners where you can see the gap in the last pic. It will get sanded down today and the entire inside of the box will get one last coat of paint. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Todays progress included glassing the edges, adding a final coat of paint to the inside of the box, and building the buss bars for the 5 D1400s. Tomorrow will be a big day. The port will get built and installed, inside of box will get resin, Front baffles will be built and installed. If I have any day light left I may try and get the front to back bracing built and installed also. Link to comment Share on other sites More sharing options...