Motasolo Posted September 11, 2013 Report Posted September 11, 2013 Build Log pictures from buddies Nissan i never got to uploading. Mostly pics of the Sub box build and fiber work and paint. 4 x 12" Kickers 1990 Nissan Maxima 4DSC Wood work done, onto fleece and fiber next. 00' GP GT 12" Fi BTL Build log with pic's :]
Motasolo Posted September 11, 2013 Author Report Posted September 11, 2013 Fleece Resin soak 00' GP GT 12" Fi BTL Build log with pic's :]
b-eazy Posted September 11, 2013 Report Posted September 11, 2013 Swweeetttttt can't wait to see this finished ;)
Motasolo Posted September 11, 2013 Author Report Posted September 11, 2013 Trimming and layers of fiberglass bondo next uploads 00' GP GT 12" Fi BTL Build log with pic's :]
Motasolo Posted September 11, 2013 Author Report Posted September 11, 2013 rear deck ports also made in the middle somewhere fiberglass rough cut finished installed 00' GP GT 12" Fi BTL Build log with pic's :]
Motasolo Posted September 11, 2013 Author Report Posted September 11, 2013 BoNdOooooo Paint next, primer then some red close to color of car. 00' GP GT 12" Fi BTL Build log with pic's :]
Motasolo Posted September 11, 2013 Author Report Posted September 11, 2013 Prime sand Prime i hate sanding then cherry something ish red, think 2 coats of each. 00' GP GT 12" Fi BTL Build log with pic's :]
Motasolo Posted September 11, 2013 Author Report Posted September 11, 2013 Red! then some carpet on sides next uploads. 00' GP GT 12" Fi BTL Build log with pic's :]
Motasolo Posted September 11, 2013 Author Report Posted September 11, 2013 Carpet to match the trunk. then woooofers 00' GP GT 12" Fi BTL Build log with pic's :]
Recommended Posts
Archived
This topic is now archived and is closed to further replies.