CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Today I re tuned the 7.5k with the DD-1. My previous best score was a 153.67. 9/30 TL sealed on the dash. With the driver door open meter on the dash. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Decals installed and passenger door panel shaved and pod ready to be built. Pod roughed in Trimmed down to allow room for fleece and bondo. I am going to put another layer of glass on the bottom edge to give it some more strength and it will be ready to start with the mdf speaker rings tomorrow. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 More work done on the passenger door today. Also 2 more sets of AA mids showed up. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Got the passenger door pod mounted and fleeced. Once the resin has set up tomorrow, I will get the speaker holes cut back out and test fit again before putting on the first coat of kitty hair. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Passenger doorpanel roughed in and installed for testing. This video has the passenger door with 2 sets of AA mids, passenger and driver kick panels with 1 AA mid and 1 Kicker tweeter per kick. I will be building the driver door pod next week and getting them both in bondo and wrapped in CF. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Here are some of the build and install pics for the doors. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Got bored. Here is another video. 1 more uploading now. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Got the trim panels started today. I did not take any pics of it but cardboard templates were made and they were a pain in the ass. Both side panels are made, I will wrap and install the driver side tomorrow. Once both sides are installed I will make a template for the top trim piece and get it cut and wrapped. I have something special planned for the trim pieces between the subs but that will come later. Link to comment Share on other sites More sharing options...
CJ18 Posted October 13, 2011 Author Report Share Posted October 13, 2011 Passenger trim wrapped and top trim wrapped and installed. I will get the meter out tonight and see if the trim gets me any closer to 154. Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.