bsneon98 Posted July 27, 2016 Report Share Posted July 27, 2016 holy shit lol Build Log: http://www.stevemeadedesigns.com/board/topic/152954-1998-plymouth-neon-updates/ Link to comment Share on other sites More sharing options...
doug118 Posted July 29, 2016 Author Report Share Posted July 29, 2016 This should have everything sounding nice and clear 2001 Tahoe. Huge front stage and 55+ substage http://www.stevemeadedesigns.com/board/topic/196418-another-tahoe-build-huge-front-stage-and-155-substage/ Link to comment Share on other sites More sharing options...
bsneon98 Posted July 29, 2016 Report Share Posted July 29, 2016 Nice headunit man! Build Log: http://www.stevemeadedesigns.com/board/topic/152954-1998-plymouth-neon-updates/ Link to comment Share on other sites More sharing options...
doug118 Posted August 6, 2016 Author Report Share Posted August 6, 2016 Changed up the loading wall. It's 5" thick so 3/4" ply, 2x4's, then another piece of 3/4". The last layer of 3/4" is still getting glassed to the truck. I'll most likely add some 6" PVC to the opening for a nice roundover 2001 Tahoe. Huge front stage and 55+ substage http://www.stevemeadedesigns.com/board/topic/196418-another-tahoe-build-huge-front-stage-and-155-substage/ Link to comment Share on other sites More sharing options...
doug118 Posted August 9, 2016 Author Report Share Posted August 9, 2016 Picked up a couple of big 2-1/2" aluminum slugs to use for bracing for the sealed side. They're going to the machine shop tomorrow to get cut down, drilled and tapped so I can run big bolts into them 2001 Tahoe. Huge front stage and 55+ substage http://www.stevemeadedesigns.com/board/topic/196418-another-tahoe-build-huge-front-stage-and-155-substage/ Link to comment Share on other sites More sharing options...
bsneon98 Posted August 10, 2016 Report Share Posted August 10, 2016 man, your not messing around! Build Log: http://www.stevemeadedesigns.com/board/topic/152954-1998-plymouth-neon-updates/ Link to comment Share on other sites More sharing options...
doug118 Posted August 11, 2016 Author Report Share Posted August 11, 2016 I'm trying not to. This box stands me like $600 so far and I still need another sheet of plywood, caulking, and PVC for the port. I don't want this thing to fail in any way shape or form 2001 Tahoe. Huge front stage and 55+ substage http://www.stevemeadedesigns.com/board/topic/196418-another-tahoe-build-huge-front-stage-and-155-substage/ Link to comment Share on other sites More sharing options...
bsneon98 Posted August 11, 2016 Report Share Posted August 11, 2016 I'm trying not to. This box stands me like $600 so far and I still need another sheet of plywood, caulking, and PVC for the port. I don't want this thing to fail in any way shape or form wow thats nuts. The most I had into an enclosure was like $100 and I gave the thing away. How do you plan on securing the box to the car? Seat belt bolts? Tuned in man! Build Log: http://www.stevemeadedesigns.com/board/topic/152954-1998-plymouth-neon-updates/ Link to comment Share on other sites More sharing options...
doug118 Posted August 11, 2016 Author Report Share Posted August 11, 2016 It's getting welding right to the floor lol 2001 Tahoe. Huge front stage and 55+ substage http://www.stevemeadedesigns.com/board/topic/196418-another-tahoe-build-huge-front-stage-and-155-substage/ Link to comment Share on other sites More sharing options...
Guest Posted August 11, 2016 Report Share Posted August 11, 2016 Picked up a couple of big 2-1/2" aluminum slugs to use for bracing for the sealed side. They're going to the machine shop tomorrow to get cut down, drilled and tapped so I can run big bolts into them Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.