Jump to content

new box 2 15's done in 1 day and installed on page 6 more vids on page 6


Recommended Posts

ok the build is going to start soon i just picked up 8 sheets of 1/2 mdf they were out of birch and the mdf cost me $3 a sheet i couldn't pass that up for the price so now i need to rework the 4th order again its going to be 1" all the way around here some pics enjoy

2013-01-13113358.jpg

2013-01-13113408.jpg

Link to comment
Share on other sites

3 dollars a sheet? what that hell? thats super cheap

2010 Mazda 3

*Rebuild Time*

Subs - (2) AA Mayhems 12's
Sub amp - (1) Populus Audio TPA 6500
Headunit - Pioneer App Radio 2

Batteries - XS Power (1) D3100 up front | 6 XP950 rear

Wire - Sky High 1/0 Gauge wires and RCA's and steve's VM1

Alternator - Singer 260 Externally Regulated

Front Stage: (2) PRV Audio 10W650A (4) PRV Audio 8MR500-PhP-4 (4) DS Bullet Tweets | (2) 6.5 Components (Rear doors)

Mids & high Amp : (2) Populus Audio 100.4

Processor: Rockford 3sixty.3



The Build Log : http://www.stevemeadedesigns.com/board/topic/175922-2010-mazda-3-2-aa-mayhems-12-pg14-new-video/page-11

flakosignature1-1_zps0751010a.png

Link to comment
Share on other sites

3 dollars a sheet? what that hell? thats super cheap

yep $3 a sheet

2013-01-13171413.jpg

Link to comment
Share on other sites

NO WAY.............. i paid 20 dollars for mine -__-

2010 Mazda 3

*Rebuild Time*

Subs - (2) AA Mayhems 12's
Sub amp - (1) Populus Audio TPA 6500
Headunit - Pioneer App Radio 2

Batteries - XS Power (1) D3100 up front | 6 XP950 rear

Wire - Sky High 1/0 Gauge wires and RCA's and steve's VM1

Alternator - Singer 260 Externally Regulated

Front Stage: (2) PRV Audio 10W650A (4) PRV Audio 8MR500-PhP-4 (4) DS Bullet Tweets | (2) 6.5 Components (Rear doors)

Mids & high Amp : (2) Populus Audio 100.4

Processor: Rockford 3sixty.3



The Build Log : http://www.stevemeadedesigns.com/board/topic/175922-2010-mazda-3-2-aa-mayhems-12-pg14-new-video/page-11

flakosignature1-1_zps0751010a.png

Link to comment
Share on other sites

3/4 is $28 a sheet the sheets i got a some blims to them and they are 1/2 they will work for what im doing the plan when im all done building my box im going to bed line it and all my panels i think for 1/2 is going to cost $18-25 a sheet whit no blims they have a lot of it left im thinking of going back

Link to comment
Share on other sites

3/4 is $28 a sheet the sheets i got a some blims to them and they are 1/2 they will work for what im doing the plan when im all done building my box im going to bed line it and all my panels i think for 1/2 is going to cost $18-25 a sheet whit no blims they have a lot of it left im thinking of going back

$28 is still cheaper than the $38 at home depot. Thanks man. Good luck with the build.

Link to comment
Share on other sites

the wood i got had almost nothing wrong with them most of it is going into the festiva :trippy: im going to do the doors and the roof and floor for the box

Link to comment
Share on other sites

3/4 is $28 a sheet the sheets i got a some blims to them and they are 1/2 they will work for what im doing the plan when im all done building my box im going to bed line it and all my panels i think for 1/2 is going to cost $18-25 a sheet whit no blims they have a lot of it left im thinking of going back

$28 is still cheaper than the $38 at home depot. Thanks man. Good luck with the build.

yeah no problem any time
Link to comment
Share on other sites

this is what my car looks like but this is not mine ill get a pic of it later

11294_zps1558f7ac.jpg

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...