Jump to content

new box 2 15's done in 1 day and installed on page 6 more vids on page 6


Recommended Posts

Posted

ok the build is going to start soon i just picked up 8 sheets of 1/2 mdf they were out of birch and the mdf cost me $3 a sheet i couldn't pass that up for the price so now i need to rework the 4th order again its going to be 1" all the way around here some pics enjoy

2013-01-13113358.jpg

2013-01-13113408.jpg

Posted

3 dollars a sheet? what that hell? thats super cheap

2010 Mazda 3

*Rebuild Time*

Subs - (2) AA Mayhems 12's
Sub amp - (1) Populus Audio TPA 6500
Headunit - Pioneer App Radio 2

Batteries - XS Power (1) D3100 up front | 6 XP950 rear

Wire - Sky High 1/0 Gauge wires and RCA's and steve's VM1

Alternator - Singer 260 Externally Regulated

Front Stage: (2) PRV Audio 10W650A (4) PRV Audio 8MR500-PhP-4 (4) DS Bullet Tweets | (2) 6.5 Components (Rear doors)

Mids & high Amp : (2) Populus Audio 100.4

Processor: Rockford 3sixty.3



The Build Log : http://www.stevemeadedesigns.com/board/topic/175922-2010-mazda-3-2-aa-mayhems-12-pg14-new-video/page-11

flakosignature1-1_zps0751010a.png

Posted

3 dollars a sheet? what that hell? thats super cheap

yep $3 a sheet

2013-01-13171413.jpg

Posted

NO WAY.............. i paid 20 dollars for mine -__-

2010 Mazda 3

*Rebuild Time*

Subs - (2) AA Mayhems 12's
Sub amp - (1) Populus Audio TPA 6500
Headunit - Pioneer App Radio 2

Batteries - XS Power (1) D3100 up front | 6 XP950 rear

Wire - Sky High 1/0 Gauge wires and RCA's and steve's VM1

Alternator - Singer 260 Externally Regulated

Front Stage: (2) PRV Audio 10W650A (4) PRV Audio 8MR500-PhP-4 (4) DS Bullet Tweets | (2) 6.5 Components (Rear doors)

Mids & high Amp : (2) Populus Audio 100.4

Processor: Rockford 3sixty.3



The Build Log : http://www.stevemeadedesigns.com/board/topic/175922-2010-mazda-3-2-aa-mayhems-12-pg14-new-video/page-11

flakosignature1-1_zps0751010a.png

Posted

3/4 is $28 a sheet the sheets i got a some blims to them and they are 1/2 they will work for what im doing the plan when im all done building my box im going to bed line it and all my panels i think for 1/2 is going to cost $18-25 a sheet whit no blims they have a lot of it left im thinking of going back

Posted

3/4 is $28 a sheet the sheets i got a some blims to them and they are 1/2 they will work for what im doing the plan when im all done building my box im going to bed line it and all my panels i think for 1/2 is going to cost $18-25 a sheet whit no blims they have a lot of it left im thinking of going back

$28 is still cheaper than the $38 at home depot. Thanks man. Good luck with the build.

Posted

the wood i got had almost nothing wrong with them most of it is going into the festiva :trippy: im going to do the doors and the roof and floor for the box

Posted

3/4 is $28 a sheet the sheets i got a some blims to them and they are 1/2 they will work for what im doing the plan when im all done building my box im going to bed line it and all my panels i think for 1/2 is going to cost $18-25 a sheet whit no blims they have a lot of it left im thinking of going back

$28 is still cheaper than the $38 at home depot. Thanks man. Good luck with the build.

yeah no problem any time
Posted

this is what my car looks like but this is not mine ill get a pic of it later

11294_zps1558f7ac.jpg

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Who's Online   0 Members, 0 Anonymous, 892 Guests (See full list)

    • There are no registered users currently online
×
×
  • Create New...