Jump to content

68 Cutty Build Log(update: Put It On A Meter)


Recommended Posts

Boston 555 subs???

yep 4 of the spg and 2 t1500-1 and a t600-4 4 6x9 in the rear deck and 2 sets of the boston z's

wow lots of work, very nice bro, cant wait to see this finished

my goal is within 2 weeks

http://www.stevemeadedesigns.com/board/ind...showtopic=29213 "sleeper build"

(1) DC AUDIO Level4XL 10

(2) PowermasterD2700 batteries

ALL FOR SALE

TEAM DC AUDIO

TEAM DIRTFLOORPOOR

Link to comment
Share on other sites

pictures of the car :D

no pics yet guy has the project backwards, paint and body last http://www.stevemeadedesigns.com/board/public/style_emoticons/default/mad.gif interior will be doon at same time as music, but it is a #'s matching 442

http://www.stevemeadedesigns.com/board/ind...showtopic=29213 "sleeper build"

(1) DC AUDIO Level4XL 10

(2) PowermasterD2700 batteries

ALL FOR SALE

TEAM DC AUDIO

TEAM DIRTFLOORPOOR

Link to comment
Share on other sites

looks like a good solid start Jack, lookin good

sundown.jpg
I have a ritual called "terminator". I crouch in the shower in the "naked terminator" pose. With eyes closed I crouch for a minute and visualize either Arnie or the guy from the 2nd movie. I then start to hum the T2 theme. Slowly I rise to a standing position and open my eyes. It helps me get through my day. The only problem is if the shower curtain sticks to my terminator leg. It sorta ruins the fantasy.
Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Who's Online   1 Member, 1 Anonymous, 985 Guests (See full list)

×
×
  • Create New...