zrkie Posted May 8, 2011 Report Posted May 8, 2011 I love the doors! Looks pretty much as I'm planning to my escalade 03! Really happy to see it can be done properly =D Keep it up ) *tuned* Don't like sharing your knowledge? Welll.. Don't come here and grab others then! - GTFO.
onebadmonte Posted May 9, 2011 Author Report Posted May 9, 2011 Added to bookmarks, looks awesome, cant wait to hear it play. How much power is going to each 7"? Thanks. Each of the 7s is getting about 125 watts each. I love the doors! Looks pretty much as I'm planning to my escalade 03! Really happy to see it can be done properly =D Keep it up ) *tuned* Thanks. The truncated frame of the mid-bass is what made it possible. If they had round frames they wouldn't have fit under the factory grill. Warhorse vs A Pair of SMDeez build Olds Cutlass Cierra IB build 2 Fi IB3 18s
onebadmonte Posted May 10, 2011 Author Report Posted May 10, 2011 What's up everybody. I got a little bit of progress done today. With the front grounds done I'm starting to work on the making the positive runs to the battery bank in the rear. I decided to poke through the firewall and run the cables through the interior up to the rear axle hump, right at the foot of the third row seats. From there I don't know just yet, but let take a look at what happened at the firewall. I already poked the power wire for processor and the front stage amp. I'll be poking the power cables through the same area. Here is the area in question. For now the, I don't know what the hell it is, controller has been relocated off to the side and I have trimmed the black matting. I'll be circling the existing wire with the new runs of power cable. I made a paper template to locate my hole locations around the existing wire. I started off by folding a standard sheet of copy paper down the center both length and width wise. With the paper nicely creased I measured from the creases out. I then folded the paper at the measurement marks overlapping the original creases as a guide to get a straight fold. Here's what it looked like once I was done with my folds. Here are the grommets mocked in place. I carefully cut my template, and taped it on to the firewall. I used a spring loaded center punch to mark my hole centers. I started off drilling a 1/16" pilot hole. I followed that up by using a stepped uni-bit to enlarge the hole to the hole saw pilot diameter of 1/4". From there it was onto the hole saw for the final cut. In this case the required hole is 1-1/8". I lucked out having just enough room for the drill and hole saw by removing the brace between the firewall and drivers side fender and the plastic fuse box cover and snap on housing. This is how it ended up looking. I'll have to run some cable through those grommets and see if that controller will be able to be mounted back in place or if it's mount will have to be modified. We'll leave that for tomorrow. Now time to chill and enjoy and ice cold beer. It was a toasty one out there today. Warhorse vs A Pair of SMDeez build Olds Cutlass Cierra IB build 2 Fi IB3 18s
onebadmonte Posted May 17, 2011 Author Report Posted May 17, 2011 Oh no! Another thread resurrect by a dang noob. I've been off the grid for a bit pondering about nothing, but now it's back to business. Since my power cables are eventually going to poke though the body, back to the great outdoors, I wanted something to secure them down out of harms way. It was back to the computer for a little CAD work. This is what I came up with. A couple a grommets and some mounting hardware, and I think I'm in business. It's all nice and pretty in the computer, but what it looks like in the real world is what matters. Check it. Wait for it, wait for it. BAM! There is a bit more to this design than meets the eye, I'll get into that a bit later. Right now before I can bolt these bad boys down I need to figure where my cables are going to run. To do that I need to finish off my battery rack. Last I left off with the buss bars in place. I need to figure out my grounds, power connections, and buss bar connections. I started off my drilling and tapping the buss bars. This wouldn't be a proper build with out some tool breakage. Damn it, broken drill. How about a little hand tapping action? Getting back to that wire hold down bracket. With a couple a snips and some filing, the bracket is shaped into some fancy wire separators. We'll see them in action in the next few pics. Here is the battery rack in all its glory Here is a close up of the passenger side. I used a piece of cardboard to mock up the frame rail so I can get my grounds setup. I'll be able to use this cardboard to transfer the ground locations onto the frame. I used my wire separators to keep everything in place. A little tip: Dusting the grommets and cables with baby powder goes a long way in sliding the cables through the grommets without hangs up. Here is the drivers side. Not much happening, just a pair of grounds. With the battery rack in an almost ready to install state I am now ready to start thinking power cable routing. I got the first row of batteries in place. I looked around the area I had to work with. I was first thinking I'd be able to poke out through the floor under the third row. The floor makes a nice vertical wall there making for a nice poke through like the firewall. Unfortunately there is a frame cross-member directly behind this wall. It was a little more than I wanted to deal with, so the search continued. I decided to poke through the floor above the rear axle pumpkin. My power cable connections on the battery rack are on the drivers side, so the cables will be routed from the center towards the drivers side. There is a frame cross-member in between where the wires poke through the body and make their connection on the battery rack. I was able to mount my wire hold down bracket on this cross-member. With all this talk of mounting locations, drilling holes, and working under the vehicle I wanted to mention eye protection. It's very important. Here is a shot of yours truly wearing his preferred type of eye protection, the full face shield. Look at that ham. Here is a shot look up at the battery rack and the wire bracket. I used some wooden dowels to show cable routing. Here is a close up of the wire bracket. Here I am looking through the hole I cut in the floor for the wires. You can see the tips of the dowels representing where the cables are going to be coming from. Now, you're probably thinking that is one hell of a hole for a few cables. Here is my thinking. It is dang near impossible to bend the cable to have it poke through the hole and have a good seal. I envisioned a sort of sump I could make to angle the cables through the floor at a 45 degree angle. This way I could get a good seal and have the cables routed in the general direction without relying on the cable to hold the shape. For the sump it was back to the computer. Here is what I came up with. A shot of the bottom side. I'm not going to be using all the mounting tabs, just the ones that land on the raised portions of the body floor. With everything cut out, I mocked up the wire sump mounting flange to drill the mounting holes in the body. Wouldn't you know it, none of the tabs hit the raised portions of the floor. I'm going to have to try again tomorrow. Warhorse vs A Pair of SMDeez build Olds Cutlass Cierra IB build 2 Fi IB3 18s
JustinWilson Posted May 17, 2011 Report Posted May 17, 2011 All I have to say is you do amazing work! 06 GP GXP Google Nexus 7 16gb Rockford Fosgate 3SIXTY.3 *Electrical* DC Power 320a HP 2 - Juicebox Bananas g31 Stinger SPP2250 rear Kinetik HC1800 side of wall Optima Red Top front Monster Cable 1/0, 2 runs to rear Monster Cable 1/0 Big 3 2-Rockford Fosgate T1652S's Rockford Fosgate T400-4 Rockford Fosgate T40001bd (4693rms @1ohm) 4-Sundown SA-15 D2's wired @ 1ohm/These are on the way out for 4 one off Eminent Audio 15's 15.2 cubes net tuned @34hz! Walled off DBdrag official 151.6db @46hz GXP Build log!:GP GXP Walled Quality is the sign of a true enthusiast! Refs: Link to leave more: http://www.stevemead...91#entry1603091 Bought from: Trippi (RF T2500bd, T1000-4),bre2ts (25ft Knu 1/0) Sold to: shmew22 (T1500bdCP), Rev. Wrath (RF 3SIXTY.1), trjohnst (Knu 1/0, 3 fuse holders), Enemyofsilence (Audio Technix, RF T400-4).
727Designs Posted May 17, 2011 Report Posted May 17, 2011 I've been waiting very impatiently for updates on this build, and you didn't let down. This is all top notch, and very high quality work. I'm impressed! -Zach-2010 Toyota TundraFull Hybrid Audio SQ 7" BDS on 37's 2000 Ford Expedition 160+ dB Green Turd -SOLD-
onebadmonte Posted May 17, 2011 Author Report Posted May 17, 2011 All I have to say is you do amazing work! Thanks I've been waiting very impatiently for updates on this build, and you didn't let down. This is all top notch, and very high quality work. I'm impressed! Glad to here you're enjoying the build. It get's slow at times because the hamster falls off the wheel in my head and I run out of solutions. Now it's starting to look as if I will finish this build. Just a little bit more to go. Warhorse vs A Pair of SMDeez build Olds Cutlass Cierra IB build 2 Fi IB3 18s
shown50 Posted May 17, 2011 Report Posted May 17, 2011 the quad alts are so sexy NEW 2011 Chevrolet Silverado LTZ 2 XS Power D3400 Kicker HyperFlex 1/0 Soundstream Vir 7870bt OLD 2010 Jeep Patriot 2 Murdered Out Black DC LVL 4 15s With XL Recones(with 1 extra spider pack a piece) 1 Crescendo BC 3500 1 MB Quart 60.4 1 Set RF T1 6x9s Up Front 1 XS Power D3400(Front) 1 XS Power D3400(Back) 2 runs of 1/0 Kicker Hyperflex SoundStream Vir 7870bt Fat Mat Rattle Trap Xtreme [www.youtube.com/tntravelers33] FEEDBACK
brads0069 Posted May 17, 2011 Report Posted May 17, 2011 Looking great! every step is one step closer....lol! Can't wait to see this finished....
onebadmonte Posted May 17, 2011 Author Report Posted May 17, 2011 the quad alts are so sexy They sure are, thanks. I've still got a little bit of work I want to do to them before I am comfortable in firing up the engine and seeing them spin. I've got a 1200 mile road trip next month I want to test this thing out on. I'll be driving through some desolate places I don't want to be broken down in, so it's best to have everything perfect. Looking great! every step is one step closer....lol! Can't wait to see this finished.... Thanks. We're almost done with the install portion. We've still got testing and tuning before we can say we're officially done though. Warhorse vs A Pair of SMDeez build Olds Cutlass Cierra IB build 2 Fi IB3 18s
Recommended Posts
Archived
This topic is now archived and is closed to further replies.