HazeGrey75 Posted August 13, 2011 Report Share Posted August 13, 2011 (edited) well, i missed a call from DC yesterday, and chode said that some might be getting phone calls about a possible added few week delay. when did you order? mid june, so.. about 2 months ago. Im willing to bet your getting the shaft again.. Sorry bro Edited August 13, 2011 by HazeGrey75 Quote Link to comment Share on other sites More sharing options...
D-train-13k Posted August 14, 2011 Report Share Posted August 14, 2011 i think im going to loose my mind if i dont hear anything about when my sub is shipping its a level 3 with level 4 softparts. i ordered it about 2nd week of april. so if theres any updates on level 3's and 4's id appreciate it Quote The IrishmanCheck out my build hereXL 4th order wall build logIn Progress:alpine cda HU4th order Bandpass2xl 15's1- ab 400.1 (gonna be two hopefully)4- Crescendo 8's2- xts crecendo supertweeters 2 sq super tweetsMb quart 4.125Mechman 270a alt1- xs D27003- xs XP3000 4- odessey pc1700seller feed back threadhttp://www.stevemeadedesigns.com/board/topic/136418-d-train-13k/ Link to comment Share on other sites More sharing options...
CJ18 Posted August 14, 2011 Report Share Posted August 14, 2011 i think im going to loose my mind if i dont hear anything about when my sub is shipping its a level 3 with level 4 softparts. i ordered it about 2nd week of april. so if theres any updates on level 3's and 4's id appreciate it Just be patient, Rob and Rusty are getting subs built as fast as possible. Personally I would rather them take their time and build them perfect than rush through them just to get them shipped out. Quote Link to comment Share on other sites More sharing options...
TjHoffman Posted August 14, 2011 Report Share Posted August 14, 2011 same here bud i ordered my lvl 4 april 16th 4 months ago and counting...delay after delay.shit gets old. maybe if they actually spent more time on subs than trolling this forum they would be done by now. GO DC!!!!WOOOO Quote Link to comment Share on other sites More sharing options...
CJ18 Posted August 14, 2011 Report Share Posted August 14, 2011 same here bud i ordered my lvl 4 april 16th 4 months ago and counting...delay after delay.shit gets old. maybe if they actually spent more time on subs than trolling this forum they would be done by now. GO DC!!!!WOOOO I don't think you realize that those of us on the forum are not at dc building subs. All of the subs are hand built one at a time by either rusty or rob. The only time either of them have posted since parts began to arrive has been either late at night or weekends. Another thing you may not realize is that they are working late nights and weekends to get all of the orders built and shipped out. I would much rather them both take their time while building my subs than for them to be rushed through just to get more out the door each day. Quote Link to comment Share on other sites More sharing options...
D-train-13k Posted August 14, 2011 Report Share Posted August 14, 2011 same here bud i ordered my lvl 4 april 16th 4 months ago and counting...delay after delay.shit gets old. maybe if they actually spent more time on subs than trolling this forum they would be done by now. GO DC!!!!WOOOO I don't think you realize that those of us on the forum are not at dc building subs. All of the subs are hand built one at a time by either rusty or rob. The only time either of them have posted since parts began to arrive has been either late at night or weekends. Another thing you may not realize is that they are working late nights and weekends to get all of the orders built and shipped out. I would much rather them both take their time while building my subs than for them to be rushed through just to get more out the door each day. i know they're workin their asses off. its just ive been without bass forever it feels like. and alls i can do is look and my incomplete box and wait lol. i still have alot of work to get done and i cant finish my 4th order until this sub is in. Quote The IrishmanCheck out my build hereXL 4th order wall build logIn Progress:alpine cda HU4th order Bandpass2xl 15's1- ab 400.1 (gonna be two hopefully)4- Crescendo 8's2- xts crecendo supertweeters 2 sq super tweetsMb quart 4.125Mechman 270a alt1- xs D27003- xs XP3000 4- odessey pc1700seller feed back threadhttp://www.stevemeadedesigns.com/board/topic/136418-d-train-13k/ Link to comment Share on other sites More sharing options...
CJ18 Posted August 14, 2011 Report Share Posted August 14, 2011 Hopefully there Should be a big batch of subs going out tomorrow. Quote Link to comment Share on other sites More sharing options...
n8ball2013 Posted August 14, 2011 Report Share Posted August 14, 2011 same here bud i ordered my lvl 4 april 16th 4 months ago and counting...delay after delay.shit gets old. maybe if they actually spent more time on subs than trolling this forum they would be done by now. GO DC!!!!WOOOO You're an idiot.rob and Rusty work 18 hours a day. Your mommy and daddy don't combine for that Quote THERE IS NO BUILD LOG! 1998 Chevy Silverado ext cab Alpine CDA-9887 4 Team Fi 15s 2 Ampere Audio TFE 8.0 2 Ampere Audio 150.4 3 Digital Designs CS6.5 component sets Dual Mechman 370XP Elite alternators inbound! 8 XS Power d3400 6 XS power d680 Second Skin Stinger Tsunami Wiring Sky High A Real Voltmeter not a piece of shit stinger. Link to comment Share on other sites More sharing options...
BeatBox Posted August 14, 2011 Report Share Posted August 14, 2011 same here bud i ordered my lvl 4 april 16th 4 months ago and counting...delay after delay.shit gets old. maybe if they actually spent more time on subs than trolling this forum they would be done by now. GO DC!!!!WOOOO lolumad? Quote Link to comment Share on other sites More sharing options...
6berry Posted August 14, 2011 Report Share Posted August 14, 2011 Hopefully there Should be a big batch of subs going out tomorrow. soooo hyped! hopefully mine are in tomorrows batch! Quote 1999 Audi A4 1.8T::: 4 - DC Level 3 10's in a 4th order Rockford P6002 on Subs for now (3-3.5k coming eventually) MB Quart ONX4.60 for Mids and Highs Boston S50 Components in Front Boston S65 Coaxials in Rear 40 Sq Ft of Second Skin Damplifier Build Thread UBL 1948 Plymouth Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.