I cant bring myself to do a toolbox. I think they look like shit and I dont want that look for this. Its on 24s and has some other things done too so its not just about the audio.
The wall is 17 cubes net with 16.5 cubes of port per iirc. Its pretty much perfect for these or their replacements. I dont think I can get alot more efficiency out of it and I'm really happy with the way it sounds.
Ive already had to pull a batt once. Its not that bad. Time consuming yes but overall doable. I built that factor into my designing when I was done. I can pull the bottom trim panel and then unhook the terminal and pull the batts out. The first one sucks the rest are cake.
Im trying to maintain that clean look. Like it could have been factory. Thats my whole goal with nothing in the bed. well that and another 500 bucks in wire that Id have to add in.