Jump to content

Welcome to the SMD forum!

CNF Kevosinn

SMD Bronze Member
  • Content Count

    4491
  • Joined

  • Last visited

  • Days Won

    8

CNF Kevosinn last won the day on December 20 2019

CNF Kevosinn had the most liked content!

Community Reputation

1702 Excellent

About CNF Kevosinn

  • Rank
    I rip doors
  • Birthday 06/23/1991

Profile Information

  • Gender
    Male
  • Location
    san cemente CA
  • Interests
    loud bass

Recent Profile Visitors

29565 profile views
  1. finally had a chance to EQ, time align and balance output left to right. Really starting to sound great now!
  2. Thanks for the kind words!! Got it playing today! Pictures are old but Haven't updated in a while. Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr
  3. the ring is epoxied and screwed and the whole assembly bolts into the door panel in 6 places. also will seal it to the door.
  4. Im not sure unfortunately. Someone bought it then I heard that Fi possibly bought it. Not 100 percent sure though. Got a lot done today! I would guess two more days and i'll have it up and playing. Just have to make the amp rack and wire it up. Then it will be a day or so of tuning with the bit one and RTA mic. Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr
  5. Shit this will be my last build for a while. I forgot how much work this is lol
  6. Thanks bro...Took me 4 years to get the itch again. The van really killed the fun. A week of prep and a week of repair after ever show wears you out. This one shouldn't be too destructive though so that's good. Got my box coated. Im doing Bed liner on the cabinets and everything in the back. This is a camping ride so I need it rugged and easy to clean. Untitled by kevosinn, on Flickr door pods coming along. Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr
  7. Made some good progress today. Got the box all body worked and ready for coating, driver pod done and ready to coat and the passenger door deadened/ covered in closed cell foam. These doors shut like tanks now. Pretty crazy. If I can get 2-3 solid days of work in I think I can get it in and playing. Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr
  8. Thanks for checking it out! Got my mid woofers in. Going to be running the Hertz Millie Legend 1650's. Cant believe how big the motors are on these for being Neo. Pretty crazy. Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr
  9. only had an hour to work today so I got the fuse holder mounted up for my 1/0 Run front to back. Im running Rockford 1/0 OFC with tech flex on top. This car goes off road a lot so I want everything protected from the elements. Using tinned lugs and adhesive heat shrink in the engine bay as well. Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr
  10. Lol I can't take a long time. For one I need this thing for my camping trips and i'm just too impatient to wait. luckily this isn't my daily though so I can leave it somewhat torn apart.
  11. Thanks guys! Got the box built today. Time to bodywork it and get it coated. Also some gear porn. Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr The box will sit to the side like this or possibly centered. I haven't totally decided. Im going to make a nice amp rack and some extra storage to trim out the back area nicely. Stoked how its coming together. Untitled by kevosinn, on Flickr
  12. Got the front doors and rear hatch deadened. 3 layers of Damplifier on outer shell then closed cell foam will go on top. Also sealing off the inner door when it all goes back together. Also got the pass side pod all finished up. It got dark so no finished pics. Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr
  13. Got a bit of work done today. Going to be running the 3" mid and tweet in a dash pod. Got my rings cut and started to fiberglass the area where they will go. Hopefully these will be looking like some pods by the end of the day tomorrow. Got my second skin in today also. Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr
  14. Got the cabinets almost done. Still have to do the finish work. Untitled by kevosinn, on Flickr Untitled by kevosinn, on Flickr Battery will sit at the front of the right drawer. Untitled by kevosinn, on Flickr
×
×
  • Create New...