The LED's are wired up, there will be a video on how the Mercury switch works soon. If you want to see a 15 second instagram clip, visit my channel @ www.instagram.com/meade916 it's just a few days ago. After i post these pics i will work on the latest video. Today's work.... I was trying to find an easy spot to put his SMD VM-1 and SMD TM-1 by the dash not really knowing what we were going to do. I didn't want to do anything fancy because i think he want's to do an Ipad mini eventually in the dash. So before i pull the trigger and fabricate something, i want to make sure he know's what he wan'ts so we don't do the work twice. Then i realized....there is 2 prime spots right in front of our face! I will let the pics do the talking.
So i just started pulling it apart, to see what kind of room i had. To my surprise, there is ENOUGH!
Ok before you ask why one hole was cut with a hole saw and the other was cut with my air tool......it is because the hole saw would have cut into the top of the factory temperature gauge numbers (dashes) a little bit. It would have shown. So i had to do a circle with a flat spot on the bottom so that would not happen. The hole is a LOT more rough but it doesn't really matter as it gets covered by the new gauge. I just thought i would explain that. As you will see i am capable of a clean hole i was just out of options for the VM-1 spot.